JOSHCO wishes to construct a new housing development in Randburg. As part of the development approval process, Johannesburg Water (JW) requires that JOSHCO upgrades portions of the existing sewer infrastructure to comply with their masterplan requirements. The proposal is to install a new sewer infrastructure adjacent to the existing system with the existing system being kept operational. The sewer infrastructure will be installed within the existing road servitude from Jan Smut Avenue to Bordeaux Riverside Park, tracking through Valley Road and Garden Road. Before the proposed sewer infrastructure connects to an existing sewer infrastructure manhole which is located on the other side of Bordeaux Riverside Park, the pipeline will cross the Braamfontein Spruit stream, alongside the existing pipe.
The proposed crossing of the Braamfontein Spruit stream requires an EA and WUL. The crossing falls within portion 44 of the Farm Klipfontein 203 IR, portion 26 of Farm 41 IR and portion 8 of Farm 42 IR (Bordeaux Riverside Park). The start, middle and end points for the pipeline through the Bordeaux Riverside Park is as follows: Start: 26° 5’57.20″S, 28° 1’4.91″E; Middle: 26° 5’5.56″S, 28° 1’12.89″E; and End: 26° 5’59.75″S, 28° 1’18.48″E.
REPORT FOR PUBLIC REVIEW- CLICK ON RESPECTIVE LINKS TO ACCESS THE FILE:
- Appendix A – Site Plans (S)
- Appendix B – Photographs
- Appendix C – Facility Illustration(S)
- Appendix D – Route Position Information
- Appendix E – Public Participation Information
- Appendix F – Water Use License(S) Authorisation, Sahra Information, Service Letters from Municipalities, Water Supply Information
- Appendix G – Specialist Reports
- Appendix H – EMPr
- Appendix I – Other Information